Platt / Parcel lockers
Your locks. Your screens. Your drawing. Our cabinet.
Welded steel locker bodies for out-of-home delivery networks — built to your construction, finished in your colour, ready for your hardware.
We build the only part of a locker nobody wants to make.
Every company in this category sells software, network and access. The steel box is the part they outsource.
That box is our whole job. You keep the brand, the platform, the design and the customer. We build the cabinet, and we prove it matches your drawing with a measurement report.
One column system. Three sizes we are tooled for.
Compact
small footprint, dense compartment mix. For lobbies and tight street sites.
Standard
the volume envelope. One tooling set, any compartment mix you draw.
Oversize
deep and tall compartments for bulky parcels.
These are envelopes, not products. You draw the locker; we tool for the family it belongs to.
How your drawing becomes a repeatable part
You send the drawing.
We quote it, with tooling costed as its own line. No changeover cost buried in a piece price.
We build a first article.
Six to eight weeks at the outside, at a cost agreed before we start.
You get numbers, not assurances.
A validated first article with a measurement report. It either matches your drawing or it does not, and you can see which.
Series production begins.
Four weeks from order. Minimum ten pieces. Minimum two hundred a year.
Build envelope
| Sheet | 1–15 mm |
|---|---|
| Assembly size | up to 2000 × 1000 × 1000 mm |
| Weight | up to about 250 kg |
| Materials | carbon steel and stainless (about 90% of our work); aluminium (about 10%) |
| Welding | MIG-MAG, TIG, stud, resistance and handheld laser — certified to ISO 3834-2:2021 |
| Finish | powder coating in-house, any colour and texture. Galvanizing and KTL through certified partners |
| Measurement | 3D scanning |
| Series | 200–10,000 a year, from batches of ten |
Cut → Bend → Weld → Blast → Coat → Assemble → Test







A locker is a tolerance problem wearing a cabinet.
Doors that still close straight after a winter outdoors. A coating that survives UV, road salt and cleaning chemicals. And cabinet number three hundred identical to cabinet number one — because a rollout is priced on install time, and install time is decided in the factory, not on the pavement.
That is what an integrated factory is for.
RC3 and its equivalents are set by the construction, and the construction is yours. Tell us the class your design targets. We build to it and hand you the measurement report.
Series of 200 to 10,000 a year, from batches of ten. Four weeks from order. Packed for site delivery and shipped by truck — Hungary is a two-day drive from most of Western Europe, not a five-week sea container.
Send us a drawing, or book 30 minutes.
Build-envelope sheet — PDF pending



